![]() The ground around the stables before Road and Ground Stabilisation Mesh has been laid. |
![]() |
![]() A hole is dug for the Bio Blok storm water soakaway. |
![]() The ground around the stables before Road and Ground Stabilisation Mesh has been laid. |
![]() Road and Ground Stabilisation Mesh |
![]() Road and Ground Stabilisation Mesh laid on the ground with clean stone on top to a depth suitable to the ground conditions. Depth shown here 2" (50mm) |
![]() Road and Ground Stabilisation Mesh laid on the ground with clean stone on top to a depth suitable to the ground conditions. Depth shown here 2" (50mm) |
![]() A path laid to the water tank |
![]() The path has been ‘wacked’ down. |
![]() 28mm scalpings down to dust have been laid over clean stone and ‘wacked’ down. |
![]() |
![]() |
As the horses walk on the surface, mud from underneath will squeeze up and
will be seeded with a |
|